page-template-default,page,page-id-15554,bridge-core-3.0.9,qi-blocks-1.2.5,qodef-gutenberg--no-touch,qodef-qi--no-touch,qi-addons-for-elementor-1.6.6,qode-page-transition-enabled,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode-child-theme-ver-1.0.0,qode-theme-ver-29.7,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-7.3,vc_responsive,elementor-default,elementor-kit-16473
 

Lucas WWTP

Owner: City of Shreveport, Louisiana

Engineer: Camp, Dresser and McKee, Inc.

 

Project consisted of installation of a high rate clarifier and appurtenances. Installation included connection to existing headworks facility, piping from the headworks to the high rate clarifier facility and piping from the high rate clarifier to the existing UV disinfection facility which included an electrical control room, sludge pump room and chemical feed system.